Day 1: Pressure Systems as Context
o How They Age and Why They Fail.
o Pressure Systems: Design Intent, MAWP and the Mechanical Integrity Framework.
o Pressure Relief Systems as the Last Line of Defense.
o Corrosion Mechanisms: General, Pitting, SCC and Hydrogen Damage.
o Mechanical Degradation: Erosion, Fatigue, Creep and Process Specific Threats.
o Exercises:
• Exercise 01: Determine whether a pressure vessel operating beyond its design life is still fit to run and establish the next decision point before the next inspection cycle closes.
• Exercise 02: Identify the specific damage mechanism behind multiple blisters on an amine absorber shell and determine the urgency of the response.
Plant Sierra Anchor Scenario: All case studies and exercises draw from an integrated process plant with a mixed equipment inventory showing various stages of degradation, used progressively across all three days.